Follow us :

Daily Work of Loading Containers

publisherLisa

time2020/01/06

JS FITTINGS produce CS butt weld pipe fittings and have good experience of package and loading. The steel pipe fittings will be packaged stable and customers no need to worry about the long trip.
Daily Work of Loading Containers
JS FITTINGS produce CS butt weld pipe fittings and have good experience of package and loading. The steel pipe fittings will be packaged stable and customers no need to worry about the long trip.

Because of the coming Spring Festival(Chinese Tradational New Year), we will delivery most orders to Russia, Vietnam, Nageria, Brazil and Mexico. It's a big work and need to keep all details safe. We have more than 5 forklift to work at the same time. In the most busy day, workers can load 5-6 containers one day.  
The factory installed a new produce line which can finish washing, drying, blasting, painting, drying and package in one time. That short the producing time a lot. 

Please click the following vedio and watch our work.